This project included a $2.4 million structural steel bridge, concrete deck repairs, new sidewalks, ramps, and curbs and gutters around the bridge. This bridge crosses the Rio Grand Gorge, spans 1280′ and is 656′ above the river.
Honesty, Reliability, and Wyoming “True Grit.”
This project included a $2.4 million structural steel bridge, concrete deck repairs, new sidewalks, ramps, and curbs and gutters around the bridge. This bridge crosses the Rio Grand Gorge, spans 1280′ and is 656′ above the river.
Here at Reiman Corp., we believe that establishing strong relationships with our project partners is the greatest indicator of a job well done.
Get in touch with us today, and let’s get to work!