At $18 million, the project encompassed the two-span steel box girder bridge, as well as a pedestrian underpass, street realignments (Logan Avenue, 6th Street, Campstool Road, and 5th Avenue/Morrie Avenue in Cheyenne, WY), storm sewer (2,500’), and water and sewer mains (9,000’). Special design elements and aesthetic enhancements incorporated in the bridge design included MSE walls, decorative bridge treatments (railing, lights, and wall patterns), and street improvements with landscape amenities, pathways, and shelters.